Skip to content
Žitnjak Residence
Exterior of the Žitnjak Residence building
Modular construction

The quality of classic construction, with shorter timelines

We produce the modules in a factory in Bosnia and Herzegovina, to EU standards. So far we have worked for the Austrian and German markets. Each unit is built on a load-bearing steel structure with full corrosion protection and is delivered as a finished whole with facade, interior works, windows, doors, sanitary fittings and prepared installations. Final connections are done on site.

Process

From the factory to a move-in-ready home

Five steps, from producing the modules to the connections on site.

  1. 1

    Tvornička proizvodnja u BiH

    Kontrolirani uvjeti i EU standardi. Bez utjecaja vremena i improvizacije na terenu.

    ~30 dana / modul
  2. 2

    3D čelični moduli

    Eurocode čelična konstrukcija s antikorozivnom zaštitom, spremna za ugradnju.

    ~30 dana / modul
  3. 3

    Transport

    Gotovi moduli dopremaju se na lokaciju. Logistika je usklađena s montažom.

    ~30 dana / modul
  4. 4

    Montaža na lokaciji

    Moduli se slažu i spajaju u zgradu u danima, a ne mjesecima.

    ~30 dana / modul
  5. 5

    Završni radovi

    Fasada, instalacije i uređenje interijera do useljive razine.

    ~30 dana / modul
Module assembly on site
Stacking modules into the building
Joining modules during assembly
Quality

What goes into every module

Steel load-bearing structure

Made of hollow profiles, designed for wind, snow, earthquake and transport.

Steel connectors

CNC-made connectors for rigid joints between modules.

Fire protection

REI 90 / F90, with defined fire compartments between modules.

FERMACELL wall system

Certified seals for all penetrations and joints.

Insulation and envelope

Thermal and acoustic insulation and an airtight, energy-efficient building envelope.

Steel load-bearing structure of a module
Steel joint between modules
Detail of the steel structure
Detail of the module joints
Benefits

Why modular makes sense

Shorter investment cycle

Shorter timelines shorten the investment cycle. A module is usually finished in about 30 days from the start of production.

Consistent quality

Factory production gives consistent quality and clear cost control.

Repeatable and scalable

Production is repeatable and scalable.

Less risk

Working off-site reduces risks and delays.

See for yourself

Walk through a typical apartment in 3D and feel the quality of modular construction.

Enter the 3D apartment